Storm door and front door installed.

Remove vinyl floor and install floor as seen,12 in. by 12 in. ceramic tile and grout,install shoe moulding and paint kitchen.

closet in attic

attic steps going to 2nd floor

two closet doors for extra space

Drywall taped, installed 44 sheets of drywall

Mantle made from oak , stain and poly

Oak Mantle

Deck built with ramp

Ramp to deck

Built in seating

Steps going to deck

Deck and stained

Deck

Deck built with 5/4 decking,plugs for lighting,gas line for stove

Mantle painted

Mantle made to fit

Chiar rail and squares installed

After

Before

Bennett Carpentry Van with son

Remove complete entry way due to water damage

New entry way

Entry way replaced and caulked and painted, square trim was added,head and side trim was all replaced

Replaced rotten framing

Repaired rotten floor

final stages of floor repair

BENNETT CARPENTRY and REPAIRS L.L.C


previous page
Powered by MSN TV